Muffle Furnace - Operation & Calibration

By: Pharma Tips | Views: 15635 | Date: 09-Oct-2011

To check the instrument performs satisfactorily and gives accurate temperature.

MUFFLE FURNACE

SOP FOR CLEANING, CALIBRATION AND OPERATION

1.0 OBJECTIVE

To check the instrument performs satisfactorily and gives accurate temperature.

2.0 SCOPE

This SOP Covers the operation and calibration procedure of Muffle furnace and this SOP is applicable to Quality Control Department.

3.0 RESPONSIBILITY

Officer / Executive

4.0 ACCOUNTABILITY

Department Head.

Muffle Furnace

5.0 PROCEDURE

5.1 CLEANING PROCEDURE

5.1.1 Check that the power supply to the instrument is switched “OFF”.

5.1.2 Ensure that the Muffle Furnace is not in hot condition or in operation while cleaning.

5.1.3 Clean the instrument externally with clean dry cloth.

5.2 OPERATING PROCEDURE

5.2.1 Ensure that the instrument is connected to the power supply.

5.2.2 Switch “ON” the main power supply, glowing of red light at mains indicates the power supply.

5.2.3 Switch on the instrument by ON position which leads to activation of green control bulb and the temperature controller.

5.2.4 Set the temperature required by pressing and holding the red ‘PRESS TO SET’ button and rotate the adjust screw to set the required temperature and release the push button.

5.2.5 The digital display shows the actual temperature of furnace and the red light of the temperature controller glows.

5.2.6 When temperature reaches at the setting point, the red light of temperature controller automatically switched “OFF” and green light will glow. The equipment is now ready for operation.

5.2.7 If any discrepancy observed during operation, inform to maintenance department for rectification.

5.3 CALIBRATION PROCEDURE

5.3.1 Calibration of the temperature will be done through external agency from Calibration Service laboratory.

5.3.2 If any discrepancy observed during operation, stop the instrument and inform to Utility department for rectification and affix “BREAK-DOWN” tag to the instrument .

5.3.3 FREQUENCY OF CALIBRATION
Once a year and after each Maintenance Job.


6.0 REASON FOR REVIEW
First time issue.

Previous Page Next Page

People Searching On This Page:
  • sop for laboratory furnace
  • Muffle furnace
  • furnaces manufacturers in chennai mail
  • mufle furnace operation
  • sop for muffle furnace pdf
  • muffle furnace temperature calibration
  • muffled fuyrnace opertation
  • muffler furnace sop
  • Muffle Furnace-Operation
  • principle and procudure about muffle furnace
  • PRODA muffle furnance
  • muffel furnance calibration
  • muffel instrument in pharma lab
  • pharma production-types of equipment calibration
  • SOP of Muffle furnace

Related Pages


Vernier Calliper’s - Operation & Calibration

Vernier Calliper’s - Operation & Calibration

Articles | Pharmaceutical Equipment
Date:
09-Oct-2011  Views: 9691

To lay down procedure to operate and calibrate Digimatic Vernier Calliper. ...
Laminar Air Flow - Operation & Calibration

Laminar Air Flow - Operation & Calibration

Articles | Pharmaceutical Equipment
Date:
03-Oct-2011  Views: 28993

To lay down a Standard Operating Procedure for laminar flow. ...
Brookfield Viscometer - Operation & Calibration

Brookfield Viscometer - Operation & Calibration

Articles | Pharmaceutical Equipment
Date:
23-Sep-2011  Views: 20392

To provide a procedure for the operating Brookfield viscometer. ...
Disintegration Tester - Operation & Calibration

Disintegration Tester - Operation & Calibration

Articles | Pharmaceutical Equipment | Tablet
Date:
01-Sep-2011  Views: 21402

Tablet disintegration testing is used as a quality-assurance measure. It is not a true predicter of how well the dosage form will release its active i ...
Centrifuge - Calibration and Operation

Centrifuge - Calibration and Operation

Articles | Pharmaceutical Equipment
Date:
30-Aug-2011  Views: 9811

To lay down an operating procedure and calibration of Centrifuge apparatus. ...
Post Your Comments (No Login Require)
Name : (required)
Email : (required)
Website :

Comment : (required)

72  + 4 =     
Comments
People Searched About:
Sop For Laboratory Furnace   |   Muffle Furnace   |   Furnaces Manufacturers In Chennai Mail   |   Mufle Furnace Operation   |   Sop For Muffle Furnace Pdf   |   Muffle Furnace Temperature Calibration   |   Muffled Fuyrnace Opertation   |   Muffler Furnace Sop   |   Muffle Furnace-Operation   |   Principle And Procudure About Muffle Furnace   |   PRODA Muffle Furnance   |   Muffel Instrument In Pharma Lab   |   SOP Of Muffle Furnace   |   Muffle Furnace Operating Procedure   |   Usp Furnace   |   SOP On Furnace Operation   |   Calibration Of Mufle Furnace   |   Furnance Calibration   |   Calibration Of Furnace Method BY Usp   |   Operation Procedure Of Muffle Furnace   |   Furnace Temperature Calibration Method   |  
Google : 1773 times | Yahoo : 50 times | Bing : 893 times |